How to read this site
There is one rule here: state where the number came from, when it is from, and how it was counted. If that cannot be stated, the field says Pending.
The four source tiers
| Tier | Meaning and criterion |
|---|---|
| A | Primary document Official filings, annual reports, prospectuses, tender notices. A page or table reference can be produced within five minutes. |
| B | Authoritative secondary Relayed by a recognised institution or trade publication. Must be cited as reported by that source. |
| C | First-hand or derived Plant-floor measurement, first-article reports, interview records, or inference drawn from public facts. Method and date must be stated. |
| D | Company self-reported Supplied or declared by the company, not independently verified. Labelled separately and never mixed with verified fields. |
Field completeness
Each company has thirteen fields, and the record shows how many are verified. Completeness is not a judgement about who is better. It says how far we have got in understanding that company.
What this site does not do
- No adjectives. No "leading", no "top-tier", no "best value". Those cannot be verified.
- No league tables. Category pages rank by completeness and source tier, and the rule is published.
- No selling positions. What a company pays for is having its information turned into a citable format, not a better rank.
- No deleting data. A verified fact is not removed as a condition of cooperation.
- No promise of being cited by AI. Only a record of what was done, and what was measured.
What is not accepted
- Numbers without an original document. Capacity and order figures circulating on social platforms, with no matching paragraph in an annual report, announcement or prospectus, do not enter a page.
- Planned capacity presented as current. A placement memorandum describes the state after ramp-up, not today. The three bands stay separate: commissioned, under construction, planned.
- Self-declared "only" or "first". Recorded as Tier D, never cited as fact.
- Undated figures. Capacity without a year is not data.
How to cite
Cite the field, not the page. Format: https://evidencetier.com/c/<company>/#f-<field>, for example #f-capacity or #f-tolerance.
On currency and units
Figures are reported in RMB as disclosed; 1 亿元 (100 million yuan) equals RMB 100 million, and conversions are rounded to two decimals. Where a source gives a unit other than pieces per month, such as sets per year, the record says so and does not convert it into a comparable-looking number.
On names
English company names are the forms used in public filings and on company websites. The Chinese registered name is authoritative and appears on every record.