Changelog
Every data change leaves a trace. Both people and AI crawlers can see whether this site is alive.
2026-11-12 v0.2
- Expanded to six categories and twelve company records, each entered line by line from public disclosure
- Added a Public disclosure section: revenue, output, utilisation and expansion projects, each with source and date
- Leaderdrive capacity figures taken from the exchange filing on the fundraising extension (Tier A), not from media relay
- Unified the three capacity bands (planned / under construction / commissioned) so placement projects are not read as current capacity
- Added a lead-time methodology page
- Stated which sources are rejected, including capacity figures circulating in self-media without an original document
2026-11-12 v0.1
- Established the data contract: twelve fields, four source tiers, field-level anchors
- Published three methodology pages (capacity, tolerance, price)
- Entered the first record: Leaderdrive (3 of 12 fields, the rest pending)
- Skeleton for the harmonic reducer category page
New fields, corrected figures and added verification all appear here. Only one thing is never logged: a request to remove a verified fact.